Powder Gate (Prašná brána) restoration in Prague, Czech Republic

The Powder Gate, a historic Gothic tower in Prague, is undergoing extensive exterior restorations that began in summer 2024, including cleaning, repairs, and stone railing restoration. HAKI Slovakia, together with EKRO CZ, provided scaffolding and safety solutions, along with technical support and training for Prague City Tourism.

Read more

Suspended Stair Tower at DEEP underwater living facility in Wales

In summer 2023 HAKI were presented with the challenge of providing a solution for safe access into the flooded quarry which has a deepest underwater point of 80 meters. This solution needed to have multiple levels above and below the water to provide employees access to the research facility and the 360m2 pontoon for deploying subs.

Read more

Securing St John's Church in Bergen

Our Norwegian customer Bergen Stillas has taken on one of its biggest projects to date - the St John's Church, which is crumbling and suffering from fallout. The church is the third tallest building in Bergen, reaching 61 metres above the ground, but its age and height are not the only things that make it unique. It also has a rather peculiar shape. Bergen Stillas' current focus has been to secure the church with customised scaffolding.

Read more

Restoration of the Great Church in Stockholm

To restore the Great Church to its original exterior it was crucial to select quality, market-leading scaffolding and temporary access solutions that would enable restoration work to be completed as seamlessly as possible. As an expert in its field, HAKI was more than capable of rising to this special challenge.

Read more

Bridge System to the Helsingborg ferry terminal

When it came to providing the temporary access solutions for a programme of works on a busy ferry terminal connecting Helsingborg, Sweden and Helsingör, Denmark, HAKI was able to step-up and accept the challenge.

Read more

Solution for the EnQuest Magnus Platform

EnQuest Magnus (formerly BP Magnus) was one of BP's best-known assets on the UK continental shelf and BP has benefited from a long production run from the oil field. As well as providing hydrocarbon production from the field, Magnus is also the entry point for the Northern Leg gas pipeline, with gas exports from other nearby installations feeding the network for transfer to the onshore St Fergus gas terminal via Brent's.

Read more

TechniSpan mobile gantry enables Forth Rail Bridge repairs

A rope access inspection of the South Span of the Forth Rail Bridge highlighted a number of fractures in the steelwork that required to be repaired. Suitable access was required to allow repairs to the steelwork and coating works.

Read more

TechiSpan speeds up Forth Road Bridge steelwork changeout

During routine inspections of the Forth Road Bridge in 2015, a crack in the pivot of one of the truss end links was discovered. The changeout of the affected steelwork initially took 18 months to complete; largely slowed down by the traditional scaffolding having to be continually modified to react to the changing work scope.

Read more

HAKI BIM saves time and secures future work

Leading scaffold design consultancy, 9Design, has incorporated the HAKI BIM plugin tool to streamline project delivery, save time, and attain better control and visibility of its scaffold projects. 

Read more

Maintenance work on the Mærsk Inspirer in Denmark

The scaffolding for maintenance work on MÆRSK INSPIER is supplied by HAKI A/S in collaboration with SEMCO MARITIME A/S. The position is approx. 60 meters high, and there are scaffolding on all three legs, about 390 tons of HAKI.

Read more

Inspection of the CETAC Fuel Tank at Vitry-Sur-Seine

This circular fuel tank needed to be inspected for corrosion and had pipes that needed to be painted. The customer had limited time to assemble the scaffolding, perform the inspection and to demolish the scaffolding. There were also problems getting around an outside staircase and pipes on the ground.

Read more

Roof repair at Château du Haut-Kœnigsbourg in Alsace

HAKI Universal can take you to great heights! Get hooked on its flexibility, light weight and safety. Check out this amazing temporary workplace high up on top of the mountains at the stunning Château du Haut-Kœnigsbourg in Orschwiller, 50 km south of Strasbourg, France.

Read more

HAKI specified for offshore Equinor platform

HAKI is the NO.1 choice for the off-shore petrochemical industry. Here is the Equinor Platform (formerly Statoil). It’s a 70,000-ton platform for the Åsta Hansten field located in the Norwegian Sea, built at the Hyundai Heavy Industries Europe facility in Ulsan, South Korea.